The skyscraper is braced by two reinforced concrete cores that are coupled by steel girders. The sculpture-like outer shape results from the inclination of the edge columns close to the facade, the deviation forces of which are equilibrated by the concrete slabs. A structural challenge was posed by the fact that a part of the building with 28 stories cantilevering 15 m had to be suspended or propped. The solution was an arrangement of inclined columns which interact with the slabs to form a truss.
Projects
NEXTOWER
HIGHLIGHT OF THE PALAIS QUARTIER IN THE HEART OF FRANKFURT AM MAIN
A sensational large construction project was realised in the inner city of Frankfurt am Main under the title of „Palais Quartier“ at the corner of Große Eschenheimer Straße / Zeil. Four buildings arose on an area of approx. 17400m²: A multi-storey hotel, the MyZeil shopping centre, the Thurn und Taxis Palais, a baroque city palace which was reconstructed during the building measures according to historical example, and the 34 storey office skyscraper „Nextower“. The 135m high office tower has a subterranean garage reaching almost 23m under the ground. To ensure an efficient construction process despite the surrounding buildings and the immense depth, the underground levels were built using the dig-and-cast construction method.
A worried phone call from a neighbour to the client caused great exhilaration in the entire project team. The client should rush to the building site because all the facade columns were crooked…
Client | MAB PROJEKTENTWICKLUNGS GMBH |
Architect | KSP ENGEL UND ZIMMERMANN, FRANKFURT AM MAIN |
Location | FRANKFURT AM MAIN, GERMANY |
Completion | 2009 |
Awards |
|